R.N. | Plant Name | City | Type | Installed Power |
---|---|---|---|---|
1 | Kozak Bendi ve HES | Kahramanmaraş | Hydroelectric | 4.4 MWe |
2 | Köyobası HES | Kahramanmaraş | Hydroelectric | 1.07 MWe |
3 | Üçkaya HES | Kahramanmaraş | Hydroelectric | 1.04 MWe |
Kozak Bendi Hydroelectric
Installed Power: 4.4 MW
Installed Power Ratio: % 0.0054
Production Capacity: 15 GWh-Yıl
Annual Electricity Generation: ~ 8 GWh
Location: Kahramanmaraş
Operating Company: Şirikçioğlu Elektrik
License Number: EÜ/1197-5/862
ÜçKaya Hydroelectric
Installed Power: 1.4 MW
Location: Kahramanmaraş
Operating Company: Şirikçioğlu Elektrik
Köybaşı Hydroelectric
Installed Power: 1.07 MW
Location: Kahramanmaraş
Operating Company: Şirikçioğlu Elektrik